Endriga said Palawan Power Generation Inc. (PPGI) is supposed to supply power to Narra and Sofronio Española, but because its capacity is only limited to 4 megawatts, there is a possibility that the latter will not have electricity until the NPC is able to fix the 69kv transmission line.